PPR Pipe Fitting Installation Method

May 13, 2026

Leave a message

Pre-installation Preparations
Installing PPR pipe fittings is like preparing for a delicate surgery; the tools and materials are indispensable:

Heat Melt Apparatus Selection: Match the appropriate die head according to the pipe diameter, and control the temperature at 260℃±5℃.

Pipe Preparation: Cut vertically with specialized scissors, ensuring a clean, burr-free cut.

Cleaning Procedure: Wipe the pipe and fitting connection surfaces with a non-woven cloth to remove dust and oil stains.

 

Key Techniques for Heat Melt Welding
Mastering these techniques will ensure your fittings are as strong as the original factory fittings:

Heating Time: Approximately 5 seconds for 20mm pipes, approximately 7 seconds for 25mm pipes, and approximately 8 seconds for 32mm pipes.

Installation Depth: Mark the end of the pipe to ensure it is inserted into the intended position.

Cooling and Shaping: Maintain the fitting in a fixed position for at least 30 seconds after welding to prevent displacement under pressure.

 

Post-Installation Quality Confirmation
Don't rush to turn on the water! These checks can prevent 80% of potential leaks:

Visual inspection: The welded rings should be uniform and full, without any signs of incomplete welding or over-melting.

Pressure test: Hold at 1.5 times the working pressure for 1 hour; the pressure drop should not exceed 0.05 MPa.

System flushing: Before first use, flush with water to remove any possible welding residue.